AiZir Flash Long Span Bridges

SKU: N/A Categories: ,

Price range: $180.00 through $250.00

AiZir Flash Long Span Bridges

Rapid Sintering Zirconia for Long-Span & Full-Arch Restorations

Aidite AiZir Flash Long Span Bridges is a premium pre-shaded zirconia engineered specifically for long-span bridges, full-arch restorations, and implant-supported prosthetics. Designed to withstand the demands of large restorations, it combines exceptional flexural strength with natural esthetics while dramatically reducing production time through rapid sintering technology.

When paired with the Aidite CSF-400 Pro, AiZir Flash Long Span Bridges can complete a full-arch long-span bridge in just 5.7 hours without compromising strength or reliability. Combined with Aidite Incisal Liquid, technicians can achieve a natural incisal gradient and lifelike esthetics while maintaining efficient production workflows.


Key Features

  • 5.7-Hour Rapid Sintering for full-arch long-span bridges with the Aidite CSF-400 Pro.
  • 1250 MPa Flexural Strength for exceptional durability in demanding restorative cases.
  • 48% Translucency delivers natural-looking esthetics while maintaining high strength.
  • Pre-Shaded Zirconia reduces staining time and improves workflow efficiency.
  • Designed specifically for long-span bridges, full-arch restorations, and implant-supported restorations.
  • Compatible with Aidite Incisal Liquid for enhanced incisal characterization and esthetics.

Recommended Indications

  • Long-span bridges
  • Full-arch restorations
  • Implant-supported bridges
  • Multi-unit restorations
  • High-load posterior restorations

Technical Specifications

Specification Value
Material Type Pre-Shaded Rapid Sintering Zirconia
Flexural Strength 1250 MPa
Translucency 48%
Fracture Toughness ≥5 MPa·m½
Vickers Hardness ≥1250 HV10
Sintered Density ≥6.0 g/cm³
CTE (25–500°C) (10.5 ± 0.5) × 10⁻⁶ K⁻¹
Available Thicknesses 20 mm, 22 mm, 25 mm, 30 mm
Available Shades A1, A2, A3, B1, C1, D2, OM1, OM2, OM3

Sintering Times

Restoration
Full-Arch Long-Span Bridge
Sintering Time
5.7 Hours (CSF-400 Pro)